Concrete Investigation & Testing

Concrete investigation and repair services

Our main aim is to provide the most appropriate service to our clients, and this must start with a thoroughly investigation of the concrete. This is vital for us in every job we perform so as it provides us with the necessary information to assess the customer and design the best possible work plan to perform at the best of our capacities. Moreover, at the same time being on the same page with client’s needs and exceeding industry standards as we currently do.

MaxBuild does concrete investigation in a wide range within the industry, going from bridge maintenance or Seismic Assessments (ISA) to concrete repairs in general. 

MaxBuild’s recent concrete investigation & testing projects include:

Drilling and reinstating with Emcrete, GPR scanning and asbestos management plan for Victoria Bridge, Cambridge.

Core drilling and reinstating with sika 438R at Mercer Ferry Bridge

Opening of ground floor slab to expose the pad footing, including cutting, breaking out, manual digging 300 mm deep, and reinstate with concrete (20MPa) at Corban Estate, Opanuku Education Building.