Waterview Motorway Extension

WORK UNDERTAKEN

MaxBuild has been working extensively with Well Connected Alliance on the Waterview Tunnel project. Our works have included:

  • Concrete repair works on the viaducts connecting the Waterview Tunnel to SH16
  • Concrete improvement works within the tunnel
  • Installation of Sikadur Combiflex SG in tunnel sumps to ensure water retention
  • Improving water tightness and leak sealing by injection of foaming polyurethane resins (TamPur 150)

Client

Well Connected Alliance

location

Waterview, Auckland

completed

2013 - 2014


Project Gallery