Rosedale Road Culvert Re-lining

WORK UNDERTAKEN

We were engaged by AMA to reline 189 metres of culvert due to the deterioration of the existing lining. Health and  Safety was paramount for us as the environment was a confined space requiring gas detectors and strict egress and  ingress compliance. Strict environmental procedures needed to be observed to eliminate contamination of the  waterway.  

Maxbuild implemented an accelerated programme to mitigate any negative impact on the surrounding waterway.  

Project Challenges:  

  • Strict environmental standards had to be met to mitigate water contamination including:  Construction of a cofferdam and diverting stream to ensure environmental compliance  
  • Monitoring and relocating aquatic life  
  • Monitoring pH levels of water  

Client

Auckland Motorway Alliance

location

Rosedale, Albany

completed

2015