WORK UNDERTAKEN

MaxBuild installed the earthing and bonding flat bars for the rail electrification network and assisted with the installation of the fiberglass screens also requiring epoxy grouting as a packer between the bridge rail and screens.


Client

Fulton Hogan / John Holland Joint Venture

location

SH20

completed

2014


Project Gallery