The Challenges
MaxBuild has been working extensively with Well Connected Alliance on the Waterview Tunnel project. Our works have included:
- Concrete repair works on the viaducts connecting the Waterview Tunnel to SH16
- Concrete improvement works within the tunnel
- Installation of Sikadur Combiflex SG in tunnel sumps to ensure water retention
- Improving watertightness and leak sealing by injection of foaming polyurethane resins (TamPur 150)