The Challenges

Old Mangere bridge is a favourite with local fisherman however to keep it a safe significant strengthening work was needed.

Both stages consisted of fabricating and installing pile jackets ready for additional grouting the then installing the connection bracing back to the main bridge structure.

Stage 3 is scheduled for late 2015.

Project Description

Client:Auckland Motorway Alliance
Location:Old Mangere Bridge
Year Completed:2013 - 2014