The Challenges

McRaes Global were appointed by the building owner to carry out a maintenance upgrade on the automated car stacker for the underground car park.

McRae’s then engaged MaxBuild to install steel tracks utilizing Sika epoxy mortars that support the  stacker structure. Extremely tight tolerances needed to be met with Sikadur 42 being used to mitigate any uneven surface to a tolerance of 1mm over 1 metre.

 

 

Project Description

Client:McRae's Global Engineering
Location:Parnell Rd
Year Completed:2015